EARL'S COURT  No Step Free Access - [1/4]
EAST HAM  No Step Free Access - [2/4]
GREEN PARK  No Step Free Access - [3/4]
WOOLWICH ARSENAL  No Step Free Access - [4/4]
LINE STATUS HISTORY
Central
Minor Delays
Minor delays westbound between Epping and Leytonstone due to a track fault at Buckhurst Hill.GOOD SERVICE on the rest of the line.
September 27 2017, 6:00 pm
Minor Delays
Minor delays westbound between Epping and Leytonstone due to a track fault at Buckhurst Hill.GOOD SERVICE on the rest of the line.
September 27 2017, 6:15 pm
Minor Delays
Minor delays westbound between Epping and Leytonstone due to a track fault at Buckhurst Hill.GOOD SERVICE on the rest of the line.
September 27 2017, 6:30 pm
District
Minor Delays
Minor delays between Turnham Green and Ealing Broadway while we fix a signaling problem in the Acton Town area. GOOD SERVICE on the rest of the line.
September 27 2017, 8:45 am
Minor Delays
Minor delays between Turnham Green and Ealing Broadway while we fix a signaling problem in the Acton Town area. GOOD SERVICE on the rest of the line.
September 27 2017, 9:00 am
Minor Delays
Minor delays between Turnham Green and Ealing Broadway while we fix a signaling problem in the Acton Town area. GOOD SERVICE on the rest of the line.
September 27 2017, 9:15 am
Minor Delays
Minor delays between Earls Court and Ealing Broadway while we fix a signaling problem in the Acton Town area. GOOD SERVICE on the rest of the line.
September 27 2017, 9:30 am
Minor Delays
Minor delays between Earls Court and Ealing Broadway while we fix a signaling problem in the Acton Town area. GOOD SERVICE on the rest of the line.
September 27 2017, 9:45 am
Minor Delays
Minor delays between Earls Court and Ealing Broadway while we fix a signaling problem in the Acton Town area. GOOD SERVICE on the rest of the line.
September 27 2017, 10:00 am
Minor Delays
Minor delays between Earls Court and Ealing Broadway while we fix a signaling problem in the Acton Town area. GOOD SERVICE on the rest of the line.
September 27 2017, 10:15 am
Minor Delays
Minor delays between Earls Court and Ealing Broadway while we fix a signaling problem in the Acton Town area. GOOD SERVICE on the rest of the line.
September 27 2017, 10:30 am
Minor Delays
Minor delays between Earls Court and Ealing Broadway while we fix a signaling problem in the Acton Town area. GOOD SERVICE on the rest of the line.
September 27 2017, 10:45 am
Minor Delays
Minor delays between Turnham Green and Ealing Broadway due to a signal problem at Acton Town.
September 27 2017, 12:45 pm
Minor Delays
Minor delays between Turnham Green and Ealing Broadway due to a signal problem at Acton Town.
September 27 2017, 1:00 pm
London Overground
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 12:00 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 12:15 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 12:30 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 12:45 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 1:00 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 1:15 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 1:30 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 4:15 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 4:30 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 4:45 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 5:00 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 5:15 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 5:30 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 5:45 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 6:00 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 6:15 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 6:30 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 6:45 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 7:00 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 7:15 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 7:30 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 7:45 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 8:00 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 8:15 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 8:30 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 8:45 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 9:00 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 9:15 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 9:30 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 9:45 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 10:00 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 10:15 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 10:30 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 10:45 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 11:00 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 11:15 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 11:30 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 11:45 am
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 12:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 12:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 12:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 12:45 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 1:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 1:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 1:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 1:45 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 2:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 2:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 2:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 2:45 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 3:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 3:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 3:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 3:45 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 4:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 4:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 4:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 4:45 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 5:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 5:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 5:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 5:45 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 6:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 6:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 6:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 6:45 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 7:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 7:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 7:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 7:45 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 8:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 8:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 8:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 8:45 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 9:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 9:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 9:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 9:45 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 10:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 10:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 10:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 10:45 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 11:00 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 11:15 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 11:30 pm
Part Closure
From Sunday 17 September until Sunday 22 October, no service Gospel Oak to Barking. This is while Network Rail continue major works to enable new, longer trains to run from spring 2018. Rail replacement bus services will operate.
September 27 2017, 11:45 pm
Metropolitan
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 12:00 am
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 12:15 am
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 12:30 am
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 12:45 am
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 1:00 am
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 1:15 am
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 1:30 am
Minor Delays
Minor delays between Wembley Park and Harrow-on-the-Hill due to signal failure at Preston Road.
September 27 2017, 12:15 pm
Minor Delays
Minor delays between Wembley Park and Harrow-on-the-Hill due to signal failure at Preston Road.
September 27 2017, 12:30 pm
Minor Delays
Minor delays between Wembley Park and Harrow-on-the-Hill due to signal failure at Preston Road.
September 27 2017, 12:45 pm
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 10:15 pm
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 10:30 pm
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 10:45 pm
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 11:00 pm
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 11:15 pm
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 11:30 pm
Part Closure
No Metropolitan line service between Aldgate and Wembley Park after approximately 2200 on Monday, Tuesday and Wednesday nights, until late 2018 due to track and drainage replacement work. Use the Jubilee line between Baker Street, Finchley Road and Wembley Park and the Circle or Hammersmith & City lines between Aldgate and Baker Street for alternative routes. During weekday evening events at Wembley and on Bank Holidays, the early closures will not apply.
September 27 2017, 11:45 pm
Piccadilly
Severe Delays
Severe delays between Acton Town Heathrow Airport / Uxbridge and MINOR DELAYS between Acton Town and Cockfosters due to an earlier signal failure at Hammersmith. Tickets are being accepted on local buses.
September 27 2017, 12:00 am
Minor Delays
Minor delays between Acton Town Heathrow Airport / Uxbridge due to an earlier signal failure at Hammersmith. GOOD SERVICE on the rest of the line.
September 27 2017, 12:15 am
Minor Delays
Minor delays between Acton Town Heathrow Airport / Uxbridge due to an earlier signal failure at Hammersmith. GOOD SERVICE on the rest of the line.
September 27 2017, 12:30 am
Minor Delays
Minor delays between Acton Town Heathrow Airport / Uxbridge due to an earlier signal failure at Hammersmith. GOOD SERVICE on the rest of the line.
September 27 2017, 12:45 am
Minor Delays
Minor delays between Acton Town Heathrow Airport / Uxbridge due to an earlier signal failure at Hammersmith. GOOD SERVICE on the rest of the line.
September 27 2017, 1:00 am
Minor Delays
Minor delays between Acton Town Heathrow Airport / Uxbridge due to an earlier signal failure at Hammersmith. GOOD SERVICE on the rest of the line.
September 27 2017, 1:15 am
Minor Delays
Minor delays between Acton Town Heathrow Airport / Uxbridge due to an earlier signal failure at Hammersmith. GOOD SERVICE on the rest of the line.
September 27 2017, 1:30 am
Severe Delays
Severe delays Acton Town to Heathrow/Uxbridge while we fix a signalling problem in the Acton Town area. MINOR DELAYS on the rest of the line. London Underground tickets will be accepted on local bus services.
September 27 2017, 8:15 am
Severe Delays
Severe delays while we fix a signalling problem in the Acton Town area. London Underground tickets will be accepted on local bus services.
September 27 2017, 8:30 am
Severe Delays
Severe delays while we fix a signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 8:45 am
Severe Delays
Severe delays while we fix a signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 9:00 am
Severe Delays
Severe delays while we fix a signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 9:15 am
Severe Delays
Severe delays while we fix a signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 9:30 am
Severe Delays
Severe delays while we fix a signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 9:45 am
Severe Delays
Severe delays while we fix a signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 10:00 am
Severe Delays
Severe delays while we fix a signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 10:15 am
Severe Delays
Severe delays while we fix a signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 10:30 am
Severe Delays
Severe delays while we fix a signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 10:45 am
Severe Delays
Severe delays due to an earlier signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 11:00 am
Severe Delays
Severe delays due to an earlier signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 11:15 am
Severe Delays
Severe delays due to an earlier signaling problem in the Acton Town area. London Underground tickets will be accepted on London Overground, Great Northern, Greater Anglia and local bus services.
September 27 2017, 11:30 am
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem in the Acton Town area. Tickets valid on local buses. Minor delays on the rest of the line.
September 27 2017, 11:45 am
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem in the Acton Town area. Tickets valid on local buses. Minor delays on the rest of the line.
September 27 2017, 12:00 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem in the Acton Town area. Tickets valid on local buses. Minor delays on the rest of the line.
September 27 2017, 12:15 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem in the Acton Town area. Tickets valid on local buses. Minor delays on the rest of the line.
September 27 2017, 12:30 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem in the Acton Town area. Tickets valid on local buses. Minor delays on the rest of the line.
September 27 2017, 12:45 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem in the Acton Town area. Tickets valid on local buses. Minor delays on the rest of the line.
September 27 2017, 1:00 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem in the Acton Town area. Tickets valid on local buses. Minor delays on the rest of the line.
September 27 2017, 1:15 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem in the Acton Town area. Tickets valid on local buses. Minor delays on the rest of the line.
September 27 2017, 1:30 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem in the Acton Town area. Tickets valid on local buses. Minor delays on the rest of the line.
September 27 2017, 1:45 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem in the Acton Town area. Tickets valid on local buses. Minor delays on the rest of the line.
September 27 2017, 2:00 pm
Severe Delays
Severe delays between Acton Town and Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses. Minor delays between Acton Town and Heathrow.
September 27 2017, 2:15 pm
Severe Delays
Severe delays between Acton Town and Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses. Minor delays between Acton Town and Heathrow.
September 27 2017, 2:30 pm
Severe Delays
Severe delays between Acton Town and Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses. Minor delays between Acton Town and Heathrow.
September 27 2017, 2:45 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 3:00 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 3:15 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 3:30 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 3:45 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 4:00 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 4:15 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 4:30 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 4:45 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 5:00 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 5:15 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 5:30 pm
Severe Delays
Severe delays between Acton Town and Heathrow / Uxbridge due to an earlier signaling problem at Acton Town. Tickets valid on local buses.
September 27 2017, 5:45 pm
Minor Delays
Severe delays between Acton Town and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals.Tickets valid on local buses.
September 27 2017, 6:00 pm
Minor Delays
Severe delays between Acton Town and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals.Tickets valid on local buses.
September 27 2017, 6:15 pm
Minor Delays
Severe delays between Acton Town and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals.Tickets valid on local buses.
September 27 2017, 6:30 pm
Minor Delays
Severe delays between Ac ton Town and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals.Tickets valid on local buses.
September 27 2017, 6:45 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane Tickets valid on local buses
September 27 2017, 7:00 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane Tickets valid on local buses
September 27 2017, 7:15 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane Tickets valid on local buses
September 27 2017, 7:30 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane Tickets valid on local buses
September 27 2017, 7:45 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 8:00 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 8:15 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 8:30 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 8:45 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 9:00 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 9:15 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 9:30 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 9:45 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 10:00 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 10:15 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 10:30 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 10:45 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 11:00 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 11:15 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 11:30 pm
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to an earlier signaling problem at Acton Town. MINOR DELAYS between Acton Town and Heathrow Terminals / Rayners Lane GOOD SERVICE on the rest of the line.
September 27 2017, 11:45 pm
Trams
Minor Delays
Minor delays between Wimbledon and New Addington to prevent overcrowding
September 27 2017, 6:30 pm
Minor Delays
Minor delays between Wimbledon and New Addington to prevent overcrowding
September 27 2017, 6:45 pm
Minor Delays
Minor delays between Wimbledon and New Addington to prevent overcrowding
September 27 2017, 7:00 pm
Minor Delays
Minor delays between Wimbledon and New Addington to prevent overcrowding
September 27 2017, 7:15 pm
Minor Delays
Minor delays between Wimbledon and New Addington to prevent overcrowding
September 27 2017, 7:30 pm