EARL'S COURT  No Step Free Access - [1/4]
EAST HAM  No Step Free Access - [2/4]
GREEN PARK  No Step Free Access - [3/4]
WOOLWICH ARSENAL  No Step Free Access - [4/4]
LINE STATUS HISTORY
Circle
Part Closure
No service between Hammersmith and Edgware Road due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 5:45 am
Part Closure
No service between Hammersmith and Edgware Road due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 6:00 am
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 4:00 pm
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 4:15 pm
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 4:30 pm
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 4:45 pm
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 5:00 pm
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 5:15 pm
District
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 12:00 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 12:15 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 12:30 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 12:45 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 1:00 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 1:15 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 1:30 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 5:45 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 6:00 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 6:15 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 6:30 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 6:45 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 7:00 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 7:15 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 7:30 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 7:45 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 8:00 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 8:15 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 8:30 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. Minor delays between Earl's Court and Wimbledon while we fix a Network Rail signal failure at Wimbledon. GOOD SERVICE on the rest of the line.
January 13 2013, 8:45 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. Minor delays between Earl's Court and Wimbledon while we fix a Network Rail signal failure at Wimbledon. GOOD SERVICE on the rest of the line.
January 13 2013, 9:00 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 9:15 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 9:30 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 9:45 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 10:00 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 10:15 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 10:30 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 10:45 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 11:00 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 11:15 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 11:30 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 11:45 am
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 12:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 12:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 12:30 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 12:45 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 1:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 1:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 1:30 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 1:45 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 2:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 2:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 2:30 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 2:45 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 3:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 3:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 3:30 pm
Part Suspended
No service between Dagenham East and Upminster due to planned engineering work. No service between Tower Hill and Dagenham East, eastbound only, while we fix a faulty train at Whitechapel. GOOD SERVICE on the rest of the line.
January 13 2013, 3:45 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. Severe delays between Tower Hill and Dagenham East, eastbound only, due to an earlier faulty train at Whitechapel. GOOD SERVICE on the rest of the line.
January 13 2013, 4:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. Minor delays between Tower Hill and Dagenham East due to an earlier faulty train at Whitechapel. GOOD SERVICE on the rest of the line.
January 13 2013, 4:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. Minor delays between Tower Hill and Dagenham East due to an earlier faulty train at Whitechapel. GOOD SERVICE on the rest of the line.
January 13 2013, 4:30 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. Minor delays between Tower Hill and Dagenham East due to an earlier faulty train at Whitechapel. GOOD SERVICE on the rest of the line.
January 13 2013, 4:45 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. Minor delays between Tower Hill and Dagenham East due to an earlier faulty train at Whitechapel. GOOD SERVICE on the rest of the line.
January 13 2013, 5:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. Minor delays between Tower Hill and Dagenham East due to an earlier faulty train at Whitechapel. GOOD SERVICE on the rest of the line.
January 13 2013, 5:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 5:30 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 5:45 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 6:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 6:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 6:30 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 6:45 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 7:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 7:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 7:30 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 7:45 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 8:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 8:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 8:30 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 8:45 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 9:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 9:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 9:30 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 9:45 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 10:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 10:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 10:30 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 10:45 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 11:00 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 11:15 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 11:30 pm
Part Closure
No service between Dagenham East and Upminster due to planned engineering work. GOOD SERVICE on the rest of the line.
January 13 2013, 11:45 pm
Hammersmith and City
Minor Delays
Minor delays eastbound only due to temporary shortage of train operators. GOOD SERVICE westbound.
January 13 2013, 1:00 pm
Minor Delays
Minor delays eastbound only due to temporary shortage of train operators. GOOD SERVICE westbound.
January 13 2013, 1:15 pm
Minor Delays
Minor delays eastbound only due to temporary shortage of train operators. GOOD SERVICE westbound.
January 13 2013, 1:30 pm
Minor Delays
Minor delays eastbound only due to temporary shortage of train operators. GOOD SERVICE westbound.
January 13 2013, 1:45 pm
Part Suspended
No service between Liverpool Street and Barking while we fix a faulty train at Whitechapel. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 3:45 pm
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 4:00 pm
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 4:15 pm
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 4:30 pm
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 4:45 pm
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 5:00 pm
Minor Delays
Minor delays due to an earlier faulty train at Whitechapel.
January 13 2013, 5:15 pm
London Overground
Part Closure
No service between Clapham Junction and Kensington Olympia due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 12:00 am
Part Closure
No service between Clapham Junction and Kensington Olympia due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 12:15 am
Part Closure
No service between Clapham Junction and Kensington Olympia due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 12:30 am
Part Closure
No service between Clapham Junction and Kensington Olympia due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 12:45 am
Part Closure
No service between Clapham Junction and Kensington Olympia due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 1:00 am
Part Closure
No service between Clapham Junction and Kensington Olympia due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 1:15 am
Part Closure
No service between Clapham Junction and Kensington Olympia due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 1:30 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 6:00 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 6:15 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 6:30 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 6:45 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 7:00 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 7:15 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 7:30 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 7:45 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 8:00 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 8:15 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 8:30 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 8:45 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 9:00 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 9:15 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 9:30 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 9:45 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 10:00 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 10:15 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 10:30 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 10:45 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 11:00 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 11:15 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 11:30 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 11:45 am
Part Closure
No service between Clapham Junction and Willesden Junction until approximately 12.00 hrs due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 12:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 12:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 12:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 12:45 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 1:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 1:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 1:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 1:45 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 2:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 2:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 2:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 2:45 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 3:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 3:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 3:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 3:45 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 4:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 4:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 4:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 4:45 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 5:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 5:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 5:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 5:45 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 6:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 6:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 6:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 6:45 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 7:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 7:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 7:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 7:45 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 8:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 8:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 8:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 8:45 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 9:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 9:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 9:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 9:45 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 10:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 10:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 10:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 10:45 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 11:00 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 11:15 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 11:30 pm
Part Closure
No service between Clapham Junction and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on all other routes.
January 13 2013, 11:45 pm
Northern
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 12:00 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 12:15 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 12:30 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 12:45 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 1:00 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 1:15 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 1:30 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 5:45 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 6:00 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 6:15 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 6:30 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 6:45 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 7:00 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 7:15 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 7:30 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 7:45 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE on the rest of the line.
January 13 2013, 8:00 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. Minor delays between Camden Town and High Barnet due to an earlier signal failure in the Finchley Central area. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 8:15 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. Minor delays between Camden Town and High Barnet due to an earlier signal failure in the Finchley Central area. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 8:30 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 8:45 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 9:00 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 9:15 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 9:30 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 9:45 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 10:00 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 10:15 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 10:30 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 10:45 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 11:00 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 11:15 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 11:30 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 11:45 am
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 12:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 12:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 12:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 12:45 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 1:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 1:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 1:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 1:45 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 2:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 2:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 2:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 2:45 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 3:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 3:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 3:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 3:45 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 4:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 4:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 4:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 4:45 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 5:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 5:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 5:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 5:45 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 6:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 6:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 6:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 6:45 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 7:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 7:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 7:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 7:45 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 8:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 8:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 8:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 8:45 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 9:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 9:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 9:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 9:45 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 10:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 10:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 10:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 10:45 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 11:00 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 11:15 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 11:30 pm
Part Closure
No service between Tooting Broadway and Morden due to planned engineering work. A rail replacement bus service operates. GOOD SERVICE in operation on the rest of the line.
January 13 2013, 11:45 pm